Like all of the bicycle industry, our supply chain for both frames and components is very stretched and subject to change. This page gives an estimate of when an order will be fulfilled. But a more accurate date is sent out with the Sales Order Confirmation sheet once the order has been placed.
Scroll down for the model and size/colour. Scroll across for the build and projected delivery date.
These are estimates of when your order would ship.
— These lead times only apply to new orders and the dates here do not reflect the ETAs of current orders. —
— If a size and colour is not shown, it is sold out and discontinued. —
Strael 4.0 Availability
The Strael is our multi award winning all season road bike.
| Colour / Size | Frameset Only | Shimano 105 R7120 12 Speed | Shimano 105 R7170 Di2 12 Speed | Shimano Ultegra R8170 Di2 12 Speed | Shimano Dura-Ace R9270 Di2 12 Speed | SRAM Force E1 XPLR AXS 1x 13 Speed | SRAM Force E1 AXS 2x 12 Speed |
|---|---|---|---|---|---|---|---|
| 51R / Ochre | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 51R / Pearlescent Blue | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 51R / Stealth | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 51T / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 51T / Pearlescent Blue | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 51T / Stealth | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 54R / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 54R / Pearlescent Blue | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 54R / Stealth | Late February 2026 | Early March 2026 | Early May 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Early April 2026 |
| 54T / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 54T / Pearlescent Blue | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 54T / Stealth | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 56R / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 56R / Pearlescent Blue | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 56R / Stealth | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 56T / Ochre | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 56T / Pearlescent Blue | Late June 2026 | Late June 2026 | Late June 2026 | Late June 2026 | Late June 2026 | Late June 2026 | Late June 2026 |
| 56T / Stealth | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 58R / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 58R / Pearlescent Blue | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 58R / Stealth | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 58T / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 58T / Pearlescent Blue | Late February 2026 | Early March 2026 | Early May 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Early April 2026 |
| 58T / Stealth | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 61R / Ochre | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 61R / Pearlescent Blue | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 61R / Stealth | Late March 2026 | Late March 2026 | Early May 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Early April 2026 |
| 61T / Monochrome | Late February 2026 | Early March 2026 | Early May 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Early April 2026 |
| 61T / Ochre | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 | Early May 2026 |
| 61T / Pearlescent Blue | Late February 2026 | Early March 2026 | Early May 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Early April 2026 |
| 61T / Stealth | Late February 2026 | Early March 2026 | Early May 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Early April 2026 |
| Last updated: November 13, 2025 3:09 pm | |||||||
* If a size and colour is not shown, it is sold out and no longer available to order.
Secan 3.0 Availability
The Secan is our bike for fast byway adventures. The design of the Secan revolves around the simple idea that you can transition between road and off-road and ride fast everywhere.
| Colour / Size | Frameset Only | Shimano GRX RX610 1x 12 Speed | Shimano GRX RX610 2x 12 Speed | Shimano GRX RX820 1x 12 Speed | Shimano GRX RX820 1x 12 Speed – Dropper Enabled | Shimano GRX RX820 2x 12 Speed | Shimano GRX RX825 Di2 1x 12 Speed | Shimano GRX RX825 Di2 2x 12 Speed | SRAM Force E1 XPLR AXS 1x 13 Speed |
|---|---|---|---|---|---|---|---|---|---|
| 51R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 51R / Desert | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 |
| 51R / Pearlescent Blue | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 |
| 51R / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 51T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 51T / Desert | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 |
| 51T / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 51T / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54R / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54R / Pearlescent Blue | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 | Late March 2026 |
| 54R / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54T / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54T / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54T / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56R / Burnt Orange | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 |
| 56R / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56R / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56R / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56T / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56T / Pearlescent Blue | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 | Early June 2026 |
| 56T / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58R / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58R / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58R / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58T / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58T / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58T / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61R / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61R / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61T / Desert | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61T / Pearlescent Blue | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61T / Plum | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Last updated: November 13, 2025 3:09 pm | |||||||||
** If a size and colour is not shown, it is sold out and no longer available to order.
Faran 3.0 Availability
The Faran is all about utility and versatility; road plus, commuting, gravel rides, audax, randonneuring with a small front rack, or touring with front panniers.
| Colour / Size | Frameset Only | Shimano GRX RX610 1x 12 Speed | Shimano GRX RX610 2x 12 Speed | Shimano GRX RX820 1x 12 Speed | Shimano GRX RX820 1x 12 Speed – Dropper Enabled | Shimano GRX RX820 2x 12 Speed | Shimano GRX RX825 Di2 1x 12 Speed | Shimano GRX RX825 Di2 2x 12 Speed | SRAM Force E1 XPLR AXS 1x 13 Speed |
|---|---|---|---|---|---|---|---|---|---|
| 51T / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 51T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54R / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54T / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 54T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56R / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56T / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 56T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58R / Black | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 |
| 58R / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58T / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 58T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61T / Black | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| 61T / Burnt Orange | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Last updated: November 13, 2025 3:09 pm | |||||||||
** If a size and colour is not shown, it is sold out and no longer available to order.
Holt 2.0 Availability
The Holt is our XC mountain bike.
| Colour / Size | Frameset Only | Shimano XT 1x 12 Speed | Shimano XT Di2 1x 12 Speed | SRAM GX Transmission 1x 12 Speed |
|---|---|---|---|---|
| Large / Charcoal | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Large / Moss | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Large / Violet | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 |
| Medium / Charcoal | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Medium / Moss | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Medium / Violet | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Small / Charcoal | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Small / Moss | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Small / Violet | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| X-Large / Charcoal | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 |
| X-Large / Moss | Early August 2026 | Early August 2026 | Early August 2026 | Early August 2026 |
| X-Large / Violet | Late February 2026 | Late February 2026 | Late February 2026 | Late February 2026 |
| Last updated: November 13, 2025 3:09 pm | ||||
** If a size and colour is not shown, it is sold out and no longer available to order.
If you are unsure about the availability of your desired build just get in touch and we can confirm the ETA for you.